Код: 0009
We’ll be happy to assist you.
Please complete this form.
Warranty: 2 years of official warranty. When signing a service agreement for 4 years, the warranty extends to 5 years.
Delivery: We deliver equipment through the transport companies SAT, Delivery, and Nova Poshta.
Service: Reliable and timely technical service from the manufacturer for 24 months.
Export of equipment: Certified products with complete documentation and worldwide delivery.
The multi-level lift table is a type of hydraulic lifting equipment designed for moving goods between floors at heights of up to 15 meters. The primary function of the device is to ensure safe and stable vertical transportation of heavy or oversized items within warehouse, industrial, or commercial facilities.
The construction of the multi-level scissor lift consists of a mechanical section (reinforced platform, lifting mechanisms, base) and an electrohydraulic system (electric motor, pump, hydraulic cylinders, control panel). The hydraulic station can be either built-in or external. For lifting heights exceeding 2 meters, the installation of guide rails (up to 4 units) is mandatory to ensure accurate platform movement without lateral play.
Installing the NIGP Dolever scissor lift does not require complex construction work but does involve preparing a pit 0.4 to 0.7 meters deep to allow flush platform positioning when retracted. The structure is mounted on a specially prepared foundation using anchor fastenings to ensure stability during operation. Installation is possible both indoors and outdoors – thanks to corrosion-resistant coatings, all lift components are protected against environmental exposure.
The price of the NIGP Dolever lift table is calculated individually for each order. It depends on platform dimensions, load capacity, number of lifting mechanisms, as well as selected options and configurations. To receive a detailed commercial offer, simply contact our manager with the basic parameters of your facility.
Don’t delay the modernization of your logistics! To purchase a lift table, contact our specialists for a detailed consultation or place your order directly on the website.
NIGP Dolever Multi-Level Lift – your reliable solution for efficient business.
The installation of the NIGP Dolever lift usually takes between 2 to 5 working days. The duration depends on the preparation of the base, the depth of the pit, and the complexity of the site. Our specialists provide full support and turnkey installation.
The standard control is via a stationary panel with buttons for lifting, lowering, and emergency stop. Additionally, remote control options or integration into the enterprise’s centralized control system are available.
The NIGP Dolever can handle up to 10,000 kg, making it a versatile solution for industrial facilities. It allows for the transport of both compact and bulky items. For non-standard tasks, we offer custom engineering solutions.
The lift is equipped with an emergency stop system, hydraulic locking devices, and a hose rupture valve. Additional safety features include protective barriers and anti-roll restraints. All equipment complies with European safety standards.
The maximum lifting height for the NIGP Dolever model is 12 meters. This is sufficient for transporting goods between multiple floors or building levels. The parameters can be customized according to the technical specifications of the site.